
Site check
Four steps, then a real design
Address, consumption, roof, contact. Nothing here is a sales qualification questionnaire. Each answer feeds a specific part of the model.
- Steps4
- TimeAbout 2 minutes
- Site checkFree
- DesignYours to keep
Start here
Tell us about the building
Demo site, so nothing is transmitted. On a live build this reaches the design desk and a surveyor calls within one business day to book the visit.
Licensing, certification and insurance
- LicensedU.32418NC electrical contractor, unlimited (demo number)
- CertifiedNABCEPPV Installation Professional on every crew
- Insured$2MGeneral liability plus workers compensation
- Rated4.9 / 5from 412 verified reviews (sample figure)
- Installed580+systems across the Triangle since 2014
- Monitored4.1 GWhcumulative production on our desk (sample figure)
NC Electrical Contractor Lic. #U.32418 (demo) · NABCEP PV Installation Professional on every crewHow we work