Monitoring desk staffed 7 days · storm response on call

Legal

Terms of Service

The terms that apply when you use this website or book services with Voltaic Energy Systems.

Last updated September 1, 2026

Agreement

By using this website you agree to these terms. If you do not agree, please do not use the site. You can reach us at desk@voltaicenergysystems.com, by phone at (919) 555-0172, or by mail at 4120 Beryl Road, Suite 210, Raleigh, NC 27606.

Use of this website

Content on this site is provided for general information. You agree not to misuse the site, attempt to gain unauthorized access, or copy content for commercial use without permission.

Quotes, estimates and bookings

Prices, estimates and availability shown online are indicative until confirmed in writing by our team. Final pricing depends on an assessment of your specific needs. Bookings are confirmed only when you receive a confirmation from us.

Cancellations

Please give us as much notice as possible if you need to cancel or reschedule. Any applicable cancellation terms will be explained when your booking is confirmed.

Limitation of liability

To the fullest extent permitted by law, we are not liable for indirect or consequential losses arising from use of this website. Nothing in these terms limits liability that cannot be limited by law.

Production estimates and savings figures

Production estimates are modelled using industry standard methods with the assumptions named in your proposal, including specific yield, shading fraction, module degradation and any escalation rate applied. Actual output varies with weather, soiling, shading changes such as tree growth, equipment performance and utility interruptions.

Figures published on this website, including savings amounts, payback periods, incentive values, pricing and equipment specifications, are illustrative samples. They are not an offer, a quotation or a guarantee. Nothing on this site constitutes tax, legal or financial advice.

Licensing and scope of work

Electrical work is performed under our North Carolina electrical contractor licence, shown as NC Electrical Contractor Lic. #U.32418 (demo) · NABCEP PV Installation Professional on every crew. Structural review on commercial projects is carried out by a licensed professional engineer. Permits and utility interconnection applications are filed by us, but approval timelines are controlled by the authority having jurisdiction and by the utility, not by us.

Warranty

Workmanship on mounting, flashing and penetrations is warranted for twenty five years from commissioning. Equipment carries the manufacturer's own warranty, registered in the customer's name at commissioning. Our production guarantee, where offered, is measured against the model printed in the signed proposal and is described in full in the contract.

Governing law

These terms are governed by the laws of the State of NC.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.